A special audit by the Tamil Nadu State Government's Audit Department has flagged financial discrepancies and irregularities involving ₹2,277.27 crore in Coimbatore Corporation during 2021–22 to 2025–26. The 419-page report, issued on August 21, 2026, was obtained under the Right to Information Act by RTI activist S.P. Thiyagarajan, and its findings were reported on Tuesday.

Source: The Hindu

The audit examined six sectors — property tax, solid waste management, maintenance works, LED streetlights, outsourcing and low-value purchases — and identified lapses in revenue collection, contract management, tender procedures and expenditure verification.

Property tax: ₹2,050.41 crore

Property tax accounted for the largest share, ₹2,050.41 crore. The single biggest finding, ₹1,194.80 crore, relates to the Corporation's failure to revise property tax multipliers in line with state government rates mandated in March 2022 and adopted by the Council in October that year. The estimated revenue shortfall covers 2022–23 to 2025–26.

The audit found 7,494 non-domestic water connections worth ₹158.32 crore and 6,270 non-domestic drainage connections worth ₹11.42 crore continued to be assessed at residential rates. Commercial, industrial and educational properties assessed the same way accounted for another ₹87.17 crore in revenue loss, and four concrete educational institutions wrongly classified as thatched structures caused a ₹68.56-lakh shortfall.

Failure to levy penalties and additional assessments on unapproved buildings accounted for ₹274.39 crore, while omission of library cess on vacant land resulted in a ₹9.48-crore loss. The audit also questioned the write-off of 2,77,737 property tax assessments involving ₹37.61 crore without the required Council resolutions and prior approval from the competent authorities.

It also identified ₹276.53 crore in high-value arrears — ₹136.52 crore from the top 100 vacant-land defaulters, ₹82.26 crore in building tax dues and ₹57.76 crore owed by 100 wilful defaulters in 2025–26, a figure that has risen 247.30% since 2021–22. Another 114 properties involved in litigation had arrears of ₹23.63 crore.

Solid waste management: ₹150.20 crore

Solid waste management discrepancies amounted to ₹150.20 crore. Contractors were paid for transporting 10.97 lakh tonnes of waste to the Vellalore dumpyard between September 2023 and March 2026, against weighbridge records accounting for only 9.36 lakh tonnes. The difference of 1.60 lakh tonnes, recorded in 26 of 31 months, resulted in an alleged excess payment of ₹53.03 crore. The audit also flagged ₹27.52 lakh spent on food and beverages for workers during the fire at the Vellalore dump yard in 2024, largely supported by handwritten receipts without GSTINs or distribution records.

Maintenance, streetlights and outsourcing

Maintenance works accounted for ₹51.93 crore, including ₹47.92 crore in interest not recovered on mobilisation advances paid to Suez Projects Private Limited for the ₹646.71-crore 24x7 water supply scheme. LED streetlight discrepancies totalled ₹16.21 crore — KCP Engineers Private Limited received ₹6.80 crore before supplying required materials, and delayed installation of 4,522 lights led to an estimated ₹2.02-crore loss in energy savings. Outsourcing irregularities across five zones amounted to ₹1.98 crore; contracts had been extended indefinitely from July 2021 without re-tendering, and vehicles listed as garbage trucks included private two-wheelers, a car and an educational bus.

The report pointed out that several supporting documents and records were either unavailable or not properly maintained by the Corporation. It recommended that the officials concerned, including the Commissioner and Assistant Commissioners, be held accountable and that the losses be recovered from the responsible contractors and officials.