Union Road Transport and Highways Minister Nitin Gadkari on Thursday inaugurated a new four-lane bridge over the Ganga at Farakka in West Bengal, opening a faster link between Murshidabad and Malda districts and easing one of north Bengal's worst road bottlenecks.
Source: Press Information Bureau
The 5.46-km bridge, built at a cost of ₹521.20 crore along with its connecting roads, runs on the Farakka–Raiganj stretch of NH-34. It will cut travel time across the Ganga, improve movement towards North Bengal and speed the movement of farm produce and goods between the two districts, according to the Ministry of Road Transport and Highways.
Source: Press Information Bureau
Relief for the old barrage crossing
The new bridge runs parallel to the ageing Farakka Barrage, built between 1962 and 1975, which carries two railway tracks, a footpath and two narrow vehicle lanes and has been heavily strained by daily traffic between north and south Bengal.
Source: The Daily Jagran
One carriageway of the new bridge, carrying Siliguri-bound traffic, had already been opened on a trial basis, while Kolkata-bound traffic continued to use the old barrage. The approach road runs from Farakka College More to PTS Township More in Malda district, letting commuters bypass bottlenecks in both Farakka and Malda towns.
Source: The Daily Jagran
The bridge has solar-powered streetlights. According to reports, survey work has also begun for a parallel rail bridge, after which the old barrage would focus on regulating river water.
Part of a wider Bengal highway package
The bridge was inaugurated at Kolaghat in Purba Medinipur district as part of 22 national highway projects worth over ₹8,700 crore for which Gadkari inaugurated completed works or laid foundation stones.
Source: Press Information Bureau
The other completed work dedicated on the day was the 63.83-km Palsit–Dankuni section of NH-19, upgraded to six lanes, strengthening the Kolkata–Durgapur corridor through Howrah, Hooghly and Burdwan districts.
Source: Press Information Bureau
Gadkari also announced major new projects for the state, including a 250-km Kolkata Ring Road estimated at ₹14,000 crore, an eight-lane Dankuni–Kolaghat corridor and a Moregram–Kishanganj high-speed corridor.
Source: Nation Press
With the formal inauguration, the bridge is now open to traffic, giving north Bengal a second crossing over the Ganga alongside the barrage.
